EPS Management

Projects

Hospital Sector

We specialize in physical security, access control, data infrastructure, and more.

Government Sector

We provide a comprehensive range of services, including data infrastructure, construction, physical security, access control, electrical infrastructure, IT provisioning, maintenance and repairs, along with programs and project management.

Warehouse Services

Our offerings include physical security, access control, and data infrastructure.

Airports

We excel in data infrastructure, construction, physical security, access control, electrical infrastructure, IT provisioning, maintenance and repairs, programs and project management, and SCADA equipment provisioning and maintenance.

CONTRACTS #

ENTITY/LOCATION

TYPE OF WORK/SOW

STATUS

POCRE-21481

PARKLAND HEALTH AND HOSPITAL DALLAS TX

LOW VOLTAGE DATA CABLING, ELECTRICAL, MISC. DEMOLITION AND BUILD-OUTS/ADDITIONS, PHYSICAL SECURITY, AND ACCESS CONTROL

MULTI-YEAR (ONGOING)

9A7001002

UT SOUTHWESTERM MEDICAL CTR.  SPRAGUE BUILDING                        DALLAS TX

2ND TIER SUBCONTRASCTOR DEMOLITION AND CONSTRUCTION WALL AND FINISH OUT – FOR BECK CONSTRUCTION

2024 (ONGOING)

PA1116

DFW INTL AIRPORT BOARD         DALLAS TX

GC. ELECTRICAL, DATA, SCADA, AND MISC. OPERATIONAL MATERIALS PROVISIOING

MULTI-YEAR (ONGOING)

18296

PARKLAND HEALTH AND HOSPITAL     DALLAS TX

DESIGN AND CONSTRUCTION: ELECTRICAL, DATA, ACCESS CONTROL, AND MISC. BUILD-OUTS/ADDITION

ONGOING

0104013578

AMZ, JACKSON, MS

2ND TIER SUB – ISP – COPPER/FIBER BACKBONE/DISTRIBUTED DATA INFRASTRUCTURE/ENDPOINTS INSTALLATION; MDF/IDF CLOSETS WORK

COMPLETED (07/2021)

0104013569

AMZ, LAS VEGAS, NV

2ND TIER SUB – ISP – COPPER/FIBER BACKBONE/DISTRIBUTED DATA INFRASTRUCTURE/ENDPOINTS INSTALLATION; MDF/IDF CLOSETS WORK

COMPLETED (08/2021)

0104013641

AMZ, FRESNO, CA

2ND TIER SUB – ISP – COPPER/FIBER BACKBONE/DISTRIBUTED DATA INFRASTRUCTURE/ENDPOINTS INSTALLATION; MDF/IDF CLOSETS WORK

COMPLETED (09/2021)

0103013847

AMZ, PITTSTON, PA

2ND TIER SUB – ISP – COPPER/FIBER BACKBONE/DISTRIBUTED DATA INFRASTRUCTURE/ENDPOINTS INSTALLATION; MDF/IDF CLOSETS WORK

COMPLETED (2022)

9500685

DFW AIRPORT, TWY FOXTROT

2ND TIER SUB, PHASED UNDERGROUNG/ABOVE GROUND ELECTRICAL INSTALLATION AND RECONFIGURATION: CAN PLAZAS, DUCT BANKS, HDD BORES, GROUNDING/LIGHTING PROTECTION CABLE

COMPLETED (04/2021)

9500692

DFW AIRPORT, TWY MIKE, DALLAS, TX

2ND TIER SUB – PHASED ELECTRICAL WORK: RECONFIGURING OF EXISTING ELECTRICAL INFRASTRUCTURE FOR LIGHTING, SIGNAGE, BASE CANS, NEW DUCT BANKS, AND SIGN FOUNDATION

COMPLETED (04/2021)

9500698

DFW AIRPORT, RWY 18R-36L, DALLAS, TX

2ND TIER SUB – ELECTRICAL WORK: REMOVAL/REPLACEMENT OF OLD ELECTRICAL INFRASTRUCTURE IN ROFA, REMOVAL OF OLD FIXTURES AND REPLACEMENT WITH NEW, CAN PLAZAS, DUCT BANKS, NEW HOME RUN CABLING

COMPLETED (04/2021)

BUZ1714

DALLAS LOVE FIELD, DALLAS, TX

1ST TIER SUB – D-B: AIRPORT NOISE MONITORING TERMINALS SITES ON AIRPORT PERIMETER TO MEET FAA REQUIREMENTS PER 7460-I FORM FILED AND APPROVED

COMPLETED (12/2018)

7006612

DFW AIRPORT, 5 TERMINALS/CBP, DALLAS, TX

1ST TIER SUB – D-B: DATA INFRASRUCTURE- COPPER, FOR TERMINALS A, B, C, D, E & CBP INSTALLATION AND BINDING TO DFW BACKBONE; PASSENGER WAIT TIME SENSOR ENDPOINTS (710) INSTALLATION AND CONFIGURATION.

COMPLETED (12/2019)

MA8100GA230000075

AUSTIN BERGSTRON INTL. AIRPORT, AUSTIN, TX

MULTI-YEAR PROVISIONING CONTRACT FOR GE/SIEMENS PLCS, SCADA & ICS FOR BAGGAGE HANDLING SYSTEM MAINTENANCE PARTS/EQUIPMENT

ONGING

3-19-00010-04

CITY OF FT.  WORTH                               FT. WORTH, TX

2ND TIER SUB: TRAFFIC SIGNAL LOOP DETECTOR INSTALLATION AT MEACHAM BLVD AND BLUE MOUND

COMPLETED (07/2020)

3-20-0002

POTTER HOUSE CHURCH Of NORTH DALLAS, FRISCO, TX

1ST TIER SUB: D-B – NEW HIGH VOLTAGE ELECTRICAL WORK UNDERGROUND AND ABOVE GROUND FOR NEW PARKING LOT; DECOMMISSION OLD ELECTRICAL, RECONFIG, AND INSTALL NEW LED FIXTURES ON PIERED PEDESTAL AND LIGHT POLES >30’; AND ELECTRICAL FOR SIGNAGE AND IRRIGATION SYSTEM

COMPLETED (09/2021)

12-2020-001

THOMPSON

DALLAS HOTEL, DALLAS, TX

2ND TIER SUB: INSTALLATION DOOR ACCESS CONTROL READERS AND BINDING TO IDF CLOSET PIM – FLOORS 20-50 OF RESIDENTS STAIR WAY DOORS 96 DOORS

COMPLETED (02/2021)

291-15/291-11

TCCD-TRINITY RIVER, FT. WORTH

2ND TIER SUB: INSTALLATION AND CABLING FOR DOOR CARD ACCESS READER, PIDS, AND CONTROLLER INSTALLATION

COMPLETED (08/2020)

80004066579

CITY OF SAN ANTONIO, TX – SAT

GC: INSTALL CLEAR TERMINAL PAYMENT KIOSK: SECURITY, ELECTRICAL, AND DATA WORK

COMPLETED (08/2021)

8000411956 / 8000408612

CITY OF SAN ANTONIO, TX – CUELLAR PARK

GC: DEMOLITION OF OLD HIGH VOLTAGE ELECTRICAL INSFRASTRUCTURE AND INSTALLATION OF NEW LOW VOLTAGE FOR MUNUMENT LIGHTING AT CUELLAR PARK: CORE/TRENCH FOR RACEWAY TO LIGHT FIXTURES ENDPOINT, FABRICATE SAFETY TRIM FOR ADDITIONAL SECURITY TO PREVENT TAMPER OF WELL LIGHT FIXTURES

COMPLETED (09/2021)

279563

DFW AIRPORT TERMINAL – D DALLAS, TX

HEAT TRACE SYSTEM INSTALLATION: INSTALL PRIMARY AND SECONDARY POWER; INSTALL TRANSFORMER S – 277/120V 17 UNITS AT 5 GARAGE LEVELS, SUPPLY 120V TO POWER THE CHROMALX SRL DEVICES WITH RTD MODULE – FOR AMBIENT TEMPERATURE MONITORING SWITCHING

COMPLETED (1/24/2022

278804

DFW AIRPORT – EAST SIDE PLANT

COOLING TOWER MAINTENANCE & REHABILITATION – PHASE 1

COMPLETED (DEC. 2022)

279641

DFW AIRPORT – EAST SIDE PLANT

COOLING TOWER MAINTENANCE & REHABILITATION – PHASE 2

COMPLETED (FEB. 2023)

0104013421

AMZ, SUFFOLK, VA

2ND TIER SUB – ISP – COPPER/FIBER BACKBONE/DISTRIBUTED DATA INFRASTRUCTURE/ENDPOINTS INSTALLATION; MDF/IDF CLOSETS WORK

COMPLETED (05/2021)

DAS-2022-0001 875 i

CITY OF DALLAS   – ANIMAL SHELTER

CUSTOM IPAD KIOSK AND DISPLAY INSTALLATION FOR SELF SERVICE, DATA CABLE INFRASTRUCTURE AND BIND TO CITY NETWORK

COMPLETED (MAR. 2022)

POCRE-21517

PARKLAND HEALTH AND HOSPITAL DALLAS TX

PHYSICAL SECURITY – OLD PARKLAND GARAGE CCTV SURVEILLANCE FOR GARAGE AND HELIPORT; DATA INFRASTRUCTURE, DEMOLITION, ACCESS CONTROL

COMPLETED (NOV. 2022)

DFW1042

DFW INTL. AIRPORT BOARD       DALLAS TX

CUSTOM DESIGN AND FABRICATION OF RUNWAY ELECTRICAL LIGHTING CAN ALUMINUM COVER CAP PLATES

COMPLETED (AUG. 2023)

PBEAVER

DALLAS TX

RESIDENTIAL REMODELING – DEMOLITION AND REBUILFING OF WATER DAMAGE HOME – FLOODRING/CABINETRY, ELECTRICAL/PLUMBING UPGRADE

COMPLETED (NOV. 2023)

Summary

For Hospitals and Medical Centers: Our focus is on physical security, access control, and data infrastructure services.
For Government Entities: We offer data infrastructure, construction, physical security, access control, electrical infrastructure, IT provisioning, maintenance and repairs, and programs and project management.
For the Hospitality Sector: Our expertise lies in physical security, access control, and data infrastructure.
For Amazon Warehouses: We provide physical security, access control, and data infrastructure services.
For Airports: We deliver comprehensive solutions including data infrastructure, construction, physical security, access control, electrical infrastructure, IT provisioning, maintenance and repairs, programs and project management, as well as SCADA equipment provisioning and maintenance.