0104013421 |
AMZ, SUFFOLK, VA |
2ND TIER SUB - ISP – COPPER/FIBER BACKBONE/DISTRIBUTED DATA
INFRASTRUCTURE/ENDPOINTS INSTALLATION;
MDF/IDF CLOSETS WORK |
COMPLETED (05/2021) |
0104013578 |
AMZ, JACKSON, MS |
2ND TIER SUB - ISP – COPPER/FIBER BACKBONE/DISTRIBUTED DATA
INFRASTRUCTURE/ENDPOINTS INSTALLATION; MDF/IDF CLOSETS WORK |
COMPLETED (07/2021) |
0104013569 |
AMZ, LAS VEGAS, NV |
2ND TIER SUB - ISP – COPPER/FIBER BACKBONE/DISTRIBUTED DATA
INFRASTRUCTURE/ENDPOINTS INSTALLATION; MDF/IDF CLOSETS WORK |
COMPLETED (08/2021) |
0104013641 |
AMZ, FRESNO, CA |
2ND TIER SUB - ISP – COPPER/FIBER BACKBONE/DISTRIBUTED DATA
INFRASTRUCTURE/ENDPOINTS INSTALLATION; MDF/IDF CLOSETS WORK |
COMPLETED(09/2021) |
0103013847 |
AMZ, PITTSTON, PA |
2ND TIER SUB - ISP – COPPER/FIBER BACKBONE/DISTRIBUTED DATA
INFRASTRUCTURE/ENDPOINTS INSTALLATION;
MDF/IDF CLOSETS WORK |
ONGOING |
9500685 |
DFW AIRPORT, TWY FOXTROT |
2ND TIER SUB, PHASED UNDERGROUNG/ABOVE GROUND ELECTRICAL
INSTALLATION AND RECONFIGURATION: CAN PLAZAS, DUCT BANKS, HDD BORES,
GROUNDING/LIGHTING PROTECTION CABLE |
COMPLETED (04/2021) |
9500692 |
DFW AIRPORT, TWY MIKE, DALLAS, TX |
2ND TIER SUB – PHASED ELECTRICAL WORK: RECONFIGURING OF EXISTING
ELECTRICAL INFRASTRUCTURE FOR LIGHTING, SIGNAGE, BASE CANS, NEW DUCT BANKS,
AND SIGN FOUNDATION |
COMPLETED (04/2021) |
9500698 |
DFW AIRPORT, RWY 18R-36L, DALLAS, TX |
2ND TIER SUB – ELECTRICAL WORK: REMOVAL/REPLACEMENT OF OLD
ELECTRICAL INFRASTRUCTURE IN ROFA, REMOVAL OF OLD FIXTURES AND REPLACEMENT
WITH NEW, CAN PLAZAS, DUCT BANKS, NEW HOME RUN
CABLING |
COMPLETED (04/2021) |
BUZ1714 |
DALLAS LOVE FIELD, DALLAS, TX |
1ST TIER SUB – D-B: AIRPORT NOISE MONITORING TERMINALS SITES ON
AIRPORT PERIMETER TO MEET FAA REQUIREMENTS PER 7460-I FORM FILED AND APPROVED |
COMPLETED (12/2018) |
7006612 |
DFW AIRPORT, 5 TERMINALS/CBP, DALLAS, TX |
1ST TIER SUB - D-B: DATA INFRASRUCTURE- COPPER, FOR TERMINALS A,
B, C, D, E & CBP INSTALLATION AND BINDING TO DFW BACKBONE; PASSENGER WAIT
TIME SENSOR ENDPOINTS (710) INSTALLATION AND CONFIGURATION. |
COMPLETED (12/2019) |
MA8100GA170000019 |
AUSTIN BERGSTRON INTL. AIRPORT, AUSTIN, TX |
MULTI-YEAR PROVISIONING CONTRACT FOR
GE/SIEMENS PLCS, SCADA & ICS FOR BAGGAGE HANDLING SYSTEM
MAINTENANCE
PARTS/EQUIPMENT |
ONGING |
3-19-00010-04 |
CITY OF FT. WORTH FT. WORTH, TX |
2ND TIER SUB: TRAFFIC SIGNAL LOOP DETECTOR INSTALLATION AT MEACHAM
BLVD AND BLUE MOUND |
COMPLETED (07/2020) |
3-20-0002 |
POTTER HOUSE CHURCH Of NORTH DALLAS, FRISCO,
TX |
1ST TIER SUB: D-B – NEW HIGH VOLTAGE ELECTRICAL WORK UNDERGROUND
AND ABOVE GROUND FOR NEW PARKING LOT; DECOMMISSION OLD ELECTRICAL, RECONFIG,
AND INSTALL NEW LED FIXTURES ON PIERED PEDESTAL AND LIGHT POLES >30’; AND
ELECTRICAL FOR SIGNAGE AND IRRIGATION SYSTEM |
COMPLETED (09/2021) |
12-2020-001 |
THOMPSON DALLAS HOTEL, DALLAS, TX |
2ND TIER SUB: INSTALLATION DOOR ACCESS CONTROL READERS AND BINDING
TO IDF CLOSET PIM – FLOORS 20-50 OF RESIDENTS STAIR WAY DOORS 96 DOORS |
COMPLETED (02/2021) |
291-15/291-11 |
TCCD-TRINITY RIVER, FT. WORTH |
2ND TIER SUB: INSTALLATION AND CABLING FOR DOOR CARD ACCESS
READER, PIDS, AND CONTROLLER INSTALLATION |
COMPLETED (08/2020) |
80004066579 |
CITY OF SAN ANTONIO, TX – SAT |
GC: INSTALL CLEAR TERMINAL PAYMENT KIOSK:
SECURITY, ELECTRICAL, AND DATA WORK |
COMPLETED (08/2021) |
8000411956 / 8000408612 |
CITY OF SAN ANTONIO, TX – CUELLAR PARK |
GC: DEMOLITION OF OLD HIGH VOLTAGE ELECTRICAL INSFRASTRUCTURE AND INSTALLATION OF NEW LOW VOLTAGE FOR MUNUMENT LIGHTING AT CUELLAR PARK: CORE/TRENCH FOR RACEWAY TO LIGHT FIXTURES ENDPOINT, FABRICATE SAFETY TRIM FOR ADDITIONAL SECURITY TO PREVENT TAMPER OF WELL LIGHT FIXTURES |
COMPLETED (09/2021) |
300931 |
CITY OF FRISCO, TX |
GC: FEDERAL GOVERNMENT BACKED GRANT INITIATIVE – NEIGHBORHOOD REVITALIZATION AND REMODELING PROJECTS |
NEGOTIATING… |
279563 |
DFW AIRPORT TERMINAL D DALLAS, TX |
HEAT TRACE SYSTEM INSTALLATION: INSTALL PRIMARY AND SECONDARY POWER; INSTALL TRANSFORMER S - 277/120V 17 UNITS AT 5 GARAGE LEVELS, SUPPLY 120V TO POWER THE CHROMALX SRL DEVICES WITH RTD MODULE - FOR AMBIENT TEMPERATURE MONITORING SWITCHING |
COMPLETED (1/24/2022 |